Design Phase Constructability for the CSX Virginia Avenue Tunnel Reconstruction

ClientDistrict Department of Transportation (DDOT)
Service

Description:

The Virginia Avenue Tunnel had a single track that accommodates one train at a time. Reconstruction of the Virginia Avenue Tunnel to increase the tunnel width, install a second track, and raise the height of the tunnel roof to make room for double-stack intermodal container trains.

Hayat Brown’s Role:

Constructability review of the assets within the DDOT right-of-way (ROW), requiring a total reconstruction of the roadway and sidewalks, relocation of existing utilities, and updating and upgrading all DDOT infrastructure and facilities impacted by the Project. 

CSX Virginia Ave Tunnel
<!-- This site is converting visitors into subscribers and customers with OptinMonster - https://optinmonster.com :: Campaign Title: Education Campaign --> <script>(function(d,u,ac){var s=d.createElement('script');s.type='text/javascript';s.src='https://a.omappapi.com/app/js/api.min.js';s.async=true;s.dataset.user=u;s.dataset.campaign=ac;d.getElementsByTagName('head')[0].appendChild(s);})(document,205148,'bcbp1cxsfqonlixoldxz');</script> <!-- / OptinMonster -->